Scope of Work - Process Trains and Inlet Facilities:

The Scope of Work for this package comprises the supply of supervision, manpower, equipment, tools, consumables, etc, for the mechanical works, and includes the following:

  • Installation of stick-built steel structures including steel shelters
  • Installation, including rigging, hauling, assembling, setting, aligning, etc, of non-module mechanical equipment (vessels, columns, internals & externals, heat exchangers, packaged equipment, rotating machinery, flare equipment, transformers, refractory, etc)
  • Installation of piping, including the hook-up and tie-in of module piping systems, NDT and pressure testing
  • Assistance for heavy lifting work, such as preparing foundations, alignment, grouting, etc.

Indicative work volumes for the Scope of Work are:

  • Equipment Installation: 5,000 Ton
  • Piping (Hook-Up): 60,500 Inch-Dia
  • Piping (Stick-Built): 110,000 Inch-Dia